Refurbishment and Upgrade of Community Hall

A Working Group has been set up to consider the options for the refurbishment and upgrading of the existing building, considering the thermal efficiency of the building, ensuring structural integrity and making the best use of the available space for the building’s proposed uses. 

The members of the Working Group are:

Dan Pedley (Chairman) – 01283 585477 Email: djwpedley@googlemail.com

Julia Williams

John Weil

Christine Prince

Martin Spalton

If you have any questions or comments please feel free to contact any member of the working group. Please also let us know if you would like to help in any way, we would be delighted to hear from you.

March 2025 Update

The results of the public consultation about the alternative options for the kitchen layout instead of the kitchen extension showed that Option B1 (with the kitchen near Chapel Lane) is preferred by the majority of respondents, many of whom felt that this layout will make a better use of space for overflow from the Main Hall for larger events.  Various suggestions and other comments were received at the Coffee Morning on 8th March 2025.

Click here to see the full summary of the consultation and the comments and suggestions that will need to be reviewed in order to produce a final layout for the refurbishment work.

February 2025 update

Our Community Hall refurbishment plans have unfortunately had a set back.  Cost estimates for the refurbishment and extension are significantly higher than expected and beyond the level of grant funding which we hope to obtain.  The Parish Council has therefore decided to reduce the scale of the project.

It will still be possible to make the hall a comfortable space for events and activities, properly insulated, efficiently heated and with good kitchen and WC facilities, but it will be within the existing building, without an extension.

Two alternative layouts have been developed by the Refurbishment Working Group. Please click here to see the alternative layouts.

Please let us know your thoughts and preferences about the two new options to refurbish the Community Hall by emailing Dan Pedley (djwpedley@googlemail.com), or come along and chat to us at the coffee morning in the Community Hall on Saturday 8th March, 10am to midday.

November 2024 update

Building Control Approval

The Construction Drawings for the refurbishment and extension of the Community Hall have now received conditional approval from Building Control.  Most conditions will be addressed by the Structural Engineer’s report and drawings which have now been submitted to Building Control.  We hope to get final Building Control Approval by end of November which will enable us to go out to tender with full set of approved drawings.

Click here to view the building Control Approval Notice

National Lottery funding

We are delighted to advise that we have passed “Gate 1” of the National Lottery Community Funding programme, in which our submission seeking £150k was approved by the Funding Panel.  Passing Gate 1 does not make it a “done deal”, but it does mean that the project appears to satisfy the National Lottery funding priorities.  The submission for Gate 2 requires the tender process to have been carried out and some clarifications to queries raised at Gate 1.  This will need to be submitted by around March 2025.

Drawings

Click here to view the latest Plan of the Proposed Alterations Drawing C101F

Click here to view the Proposed External Elevations Drawing C201F

Click here to view the Building Sections Drawing C301F

Click here to view the Access Statement

Click here to view the Structural Engineer’s Drawing 01B

Click here to view the Structural Engineer’s Drawing 02A

Click here to view the Structural Engineer’s Drawing 03A

We hope to start the refurbishment and extension works in 2025.

September 2024 update

The construction drawings have now been prepared and will be submitted for building control approval after the structural calculations have been completed.

Click here to view the Plan of the Proposed Alterations Drawing C101D

Click here to view the Proposed External Elevations Drawing C201D

Click here to view the Building Sections Drawing C301D

A grant application will shortly be submitted to the National Lottery to seek funding for the works. We hope to have a response in early December.

Over the next few months we will continue to look at the options for heating and lighting the building, and carrying out various surveys to be able to complete the design of the works and start to obtain construction estimates. We hope to start the refurbishment and extension works in 2025.

June 2023 Update

The Architect has now finalised the drawings and submitted a planning application on behalf of the Parish Council for the alterations to the Community Hall.

Click here to see the proposed layout drawing with the new kitchen and accessible entrance.

Click here to see the proposed elevations.

Planning Permission was granted in January 2024 for the proposed change of use of the building to incorporate the internal alterations and the proposed extension.

Click here to view the Decision Notice.

November 2022

Various proposals (layout options) for upgrading and refurbishing the Community Hall were generated for consultation at an Open Day event in November 2022. 

The layout options and results of the consultation at the Open Day can be found by clicking here.